THICKENING THE MIX
DURING GROUTING OF A HOLE
For CEMENT in
BULK
and using METRIC
units
Send the make-up batch from the mixer to the agitator
While this is being done the control valve on the standpipe should be turned off in order to get
effective blending. However this turning off should be as brief as possible so as to not lose the hole.
When all the make-up batch has reached the agitator, take a measurement of the total volume of grout in
it. Then open the control valve and carry on with the grouting.
RETURN TO CHOICES SCREEN